Engineer/Sanitarian Septic Design

All the information you need to design a septic system in the Town of Duxbury is located on this page.  It is preferred that the engineer/sanitarian schedule the soil evaluation.  Payment is due five business days prior to the scheduled date.  If payment is not received the perc will not be witnessed.  A 24-hour cancellation notice is required in order to receive a refund.