When do I need a Title 5 Inspection?

A Title 5 inspection is required before the sale or expansion of your dwelling.  In Duxbury any addition greater than 50 square feet, even if it does not increase the flow to your current system, requires a Title 5 inspection.  Inground swimming pools, detached garages and enclosed porches all require a Title 5 inspection.  The Board of Health, the Department of Environmental Protection or a court may order a homeowner to perform a Title 5 inspection at any time.