Demolitions
If you are demolishing a structure that is 75 years or older you will be referred to the Historical Commission for approval.
Requirements for Obtaining a Demolition Permit:
- Complete a Building Permit Application Packet (not all pages will apply for every project) signed by the owner of the property and contractor.
- Contractor License & insurance information on file with the Building Department.
- Two plot plans showing proposed structure to be demolished.
- Utility Sign-Off Sheet with applicable signatures.
- Application will be sent to the Board of Health and Conservation for approval and to the Treasurer's Office (to be checked for outstanding taxes or fees over 1 year old).
- A permit fee of $155.00 will be charged.
- A Dumpster Permit from the Fire Department is required for all dumpsters/rubbish containers with a capacity of 6 cubic yards or more.