Engineer/Sanitarian Septic Design
All the information you need to design a septic system in the Town of Duxbury is located on this page. It is preferred that the engineer/sanitarian schedule the soil evaluation. Payment is due five business days prior to the scheduled date. If payment is not received the perc will not be witnessed. A 24-hour cancellation notice is required in order to receive a refund.
- Septic System Application Checklist
- Application for Percolation Test & Observation Hole
- Application for Percolation Test & Observation Hole with Consultant
- Procedures for Locating Water Supplies
- Sample Well Verification Letter
- MassDEP Septic Systems/Title 5
- MassDEP Title 5 Innovative/Alternative Technology Approval Letters
- Mass GIS
- USGS Duxbury Well #79
- USGS Current Groundwater Conditions
- New England Soil Survey Data
- Topographic Maps by TopoZone
- FloodInsights
- Plymouth County Registry of Deeds